Note that the progress shown here is just a rough guidance as it was generated by an automated script. A manual inspection will be done after the final submission to confirm the script's findings.
Meaning of colors/icons:
ABC : you have done the corresponding item.
ABC : you have done the corresponding item which is an optional item (well done!).
!ABC : item overdue, you have not done the corresponding item yet.
!ABC : item due soon, not done yet.
!ABC : optional item due soon, not done yet.
The [?] suffix (e.g., ABC [?]) indicates there are no data for that item yet. It will be updated in a later time when the relevant data are available.
If you have queries about the data shown in this page, please email cs2113@comp.nus.edu.sg.
This dashboard is updated daily.
Troubleshooting:
Why are my issues not being detected?
Why are my PRs not being detected?
The required change was committed/pushed -- why is it not being detected?